Engineering Insurances: Provides protection against risks that may be encountered during the construction and assembly processes of projects.
Construction All Risk Insurance: Construction all risk insurance provides comprehensive protection against various risks that may occur in construction projects. This insurance covers damages, accidents, natural disasters and other unexpected events that may occur during construction. Why Should You Have It Done? Construction projects involve various risks and uncertainties. Construction all risk insurance covers damages and costs that may occur during the project process, reduces the financial risks you may encounter in the project and ensures that the construction is completed smoothly.
Installation All Risk Insurance: Assembly all risk insurance provides protection against various risks for assembly work carried out in engineering projects. This insurance covers damages, accidents and malfunctions that may occur during assembly. Why Should You Have It Done? The assembly phase is a critical part of engineering projects, and various risks and potential problems can arise during this process. Assembly all risk insurance covers damages and costs that may occur during assembly, ensuring that the project process is completed safely and effectively.
This insurance covers any loss or damage to the values constituting the subject matter, during the guarantee period, while they are at the construction site, during the construction period, due to an unknown and sudden reason, other than the exceptions in the general/special conditions of this policy. It is essential that the insurance amount shown in the policy (including customs, taxes, duties and charges, if any, and transportation and labor costs) is equal to the final project value to be reached at the end of the project. The insurance amount cannot be less than the contract price updated with the relevant current year prices each year (including the survey increases made until that time, if any) for the works subject to tender. In addition, if insurance is made, the insurance amounts of the machinery, tools and equipment used for the construction, temporary construction sheds and auxiliary structures cannot be less than the current market values. In the event of an increase in the values constituting the insurance amount shown in the policy, the insured is responsible for notifying the insurer in writing within 5 days at the latest when he/she learns of this increase, but before any damage occurs. In order for any value increase to be considered as insured during the insurance period, the written consent of the insurer is required. Premium adjustment is made in proportion to the increase in the insurance amount. If the value increases are not accepted by the insurer, the provisions of the first danger insurance apply to this insurance.
This insurance covers any loss or damage to the assets it is about, during the guarantee period, while they are in the assembly area, due to an unexpected and sudden reason, excluding the exceptions in the general/special conditions included in the policy.
Construction/Erection Insurance endorsements are special provisions added to the insurance policy that expand or limit the coverage of certain risks. These endorsements can provide coverage for additional risks that may be encountered during construction or erection projects, such as theft, natural disaster, strike, or provide additional protection for errors that may occur during the post-project maintenance period. This allows the policy to be customized to the needs and risk situations of the project.
The insurer shall not be liable for any damages arising from sudden and unexpected causes, in short: a) Operating accidents, b) Defective model, manufacturing, assembly, material, mold, casting and workmanship, c) Lubrication defects, d) Short circuit, spark, voltage surge and insulation failure as a result of direct effect of electrical energy and indirect effects of atmospheric electricity, e) Clogging, entry of foreign substances, f) Fragments resulting from centrifugal force, g) Water deficiency in steam boilers and steam containers, h) Water hammer, sudden overheating or cooling, i) Crushing, tearing, wrinkling etc. due to low pressure in closed containers. j) It covers the repair and replacement costs required for material losses and damages resulting from deformations, j) Storm and hurricane, frost or the movement of thawing ice, k) Negligence, fault, error, carelessness or sabotage of the operating personnel or third parties, l) Other cases not excluded. It provides replaceable parts such as drills, scissors, knives, saws, steel or metal pencils or cutting tools and equipment, matrices and molds, hot rolling mill rolls in rolling mills, templates, models, picture rolls, grinders, crushers, mixers, sieves and sieves, ropes, chains, transport bands and belts and parts that are customary to be replaced or renewed at certain intervals such as coal brushes and lamps (excluding electrical insulation materials and insulation oils).
With this insurance, the amount of "loss of profit" (reduction in "gross profit") resulting from the partial or complete cessation or interruption of the "commercial activity" as a result of breakage damages in the machinery and installations used in the conduct of the "commercial activity" (details of which are described in the Policy) is compensated within the framework of the "Definitions", "Special Conditions" and "time exemptions" specified in the policy.
Coverage is provided up to the insurance amount specified in the policy.
In order for the Insurer to make payment under this policy; the machinery and equipment used by the Insured while carrying out his/her “commercial activity” must be insured under a valid and effective machinery breakdown insurance contract issued by the same Insurer, specifying the brand, model and serial number.